Adding Value #11
A few months after start-up a plant was having problems with high refrigeration condensing pressure. The first step was to […]
A few months after start-up a plant was having problems with high refrigeration condensing pressure. The first step was to […]
We recently visited a gas plant whose ethane recoveries were suffering. The plant personnel said they knew what the problem […]
How does this get designed this way? How does this get through multiple reviews including PHA’s without being noticed? How […]
Client received EPC bids from two contractors. While the client was reviewing commercial terms, schedule, etc. RCE performed a technical […]
Our client was notified by the NGL pipeline that they were going to be penalized for excessive methane (C1) in […]
RCE was involved with the design of a small refrigeration gas plant. In the span of a single week, RCE […]
During a plant visit, RCE engineers noticed that the Refrigeration Economizer was operating at a pressure very close to that […]
Lawsuit against a pipeline company alleging that delivered gas to the facility was above the 7 lbs H2O/MMSCF specification. This […]
RCE was supporting it’s client as owner’s process engineer on a large project. During early P&ID reviews RCE noted to […]
RCE engineers visited a new client’s plant that was originally built as a Residue Recycle (RR) process around 30 years […]